Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Apr 20, 2020     Left lower panel; RCP vent line; flap switch; annunciator; terminal block template - (3.2 hours)       Category: Avionics
1. Cut out mounting holes in the left lower subpanel for the CO Guardian detector and the front cockpit seat heat switch. Cut and conuntersunk holes for the attachment nutplates. Notched the hole for the seat heat switch. Test-fit both items. Sanded, cleaned, and primed the panel. (The left nutplate orientation looks psychotic, but that's what I had to do to make it work!)

2. Installed caterpillar grommet in under-floor pass-through hole, then installed the 2-foot section of scat tube connecting the right wing flange to the rear cockpit vent.

3. Located, drilled and installed a snap bushing in the small hole in the gear tower where the wires for the flap switch will run.

4. Worked on assembling the LED light assemblies in the annunciator panel.

5. Made a drill template for the half-dozen terminal strips that will be installed in various locations in the fuselage.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.